1. Define the outcome and map the estate
You receive: an asset list, a connection map, the exclusions and dependencies we found, and a scoped quote.
We map what is installed, agree the data and control boundary, connect or retrofit the gaps, and commission the workflows your team will use—before you decide on a portfolio rollout.
The process
The deployment is organised around what you need to approve: the first-site outcome, the technical boundary and the measured result. Each phase ends with something your team can inspect.
1. Define the outcome and map the estate
2. Agree the boundary and commission the workflow
3. Measure the first site and decide whether to scale
The first site should answer the expensive questions once: whether the data is reliable, whether the team will use the workflow and whether the measured outcome justifies the next building.
FAQ
A representative connection can be tested after access and compatible equipment are confirmed. Full commissioning is a separate milestone.
It depends on access, documentation, protocol availability, retrofit work, network approval and acceptance testing.
They provide site access, system contacts, network and security decisions, tariff or allocation rules, and acceptance sign-off.
We test whether a reader, gateway or supported interface can expose the signal. If not, the proposal identifies the replacement or new meter as a separate option, with the reason and cost.
Any shutdown, panel access, permit or out-of-hours work is identified in the method statement before installation.
It remains the building system where it is fit for purpose. We agree read and write ownership point by point, integrate supported data and avoid parallel control without an approved authority model.
We document the blocked interface, test safe alternatives and price any gateway or independent sensing required. We do not promise access to a closed system before the vendor and rights position are confirmed.
The final pack contains the connection map, the commissioned points, the permissions model, the acceptance results and your support contacts.
Bring one building, the systems you know about and the outcome you need. We will map the unknowns, define the decision gates and show what must happen before rollout is even discussed.