Turn schedules, occupancy, thresholds and approved recommendations into controlled actions - with safety limits, one owner per point and a local manual override.
Please enter a valid email address.
Relays & schedules
Remote switching is useful; predictable operation is the outcome. Set approved schedules by circuit, zone and season, then keep every manual or scheduled change visible across the portfolio.
Alarms that act
Decide in advance whether a condition should notify, create a task, request approval or trigger a safe command. The same rule states the limits, owner, fallback and evidence required afterward.
Beyond rules
Agents can identify repeated after-hours load or a peak forming across several circuits. They prepare the evidence and next step; execution remains inside the permission and approval boundary chosen for that site.
Volts works alongside supported BMS, controllers and relays. Before write access is enabled, the deployment assigns point ownership, native protection, fallback state and local override.
FAQ
No. Volts can work above supported existing systems and add selected retrofit controls where none exist. The integration matrix defines which system owns each writable point.
Any control system carries risk. Volts uses permissions, approvals and interlocks, while native equipment protections and local overrides remain in force.
Circuits, relays, setpoints and the commands your controller exposes. Availability depends on the controller, wiring and site safety design.
Yes. Approved schedules and rule templates can be managed across sites, but each rollout should preserve the local operating hours, equipment limits, owner and commissioning check.
No. A site can remain monitoring-only, use manual remote control, run schedules, require approval or allow selected automatic actions.
Behaviour on loss of connection is confirmed per controller at commissioning.
A local override stays in force. The system records the resulting state rather than fighting the authorised local command.
Connect the command and time window to the relevant meter data, then compare performance before and after.
Bring the circuit, schedule or threshold causing cost today. We will map the controlling system, owner, limits, fallback and evidence required before any command is enabled.