Use the meters already on site
Bring compatible electricity, water, gas and environmental readings into one building model. Add a reader, gateway or meter only where the required signal is unavailable.
Integrations without disruption
Volts connects the systems that measure, control, bill and report your buildings - so verified data can move from consumption to action and cost recovery without an unnecessary replacement programme.
What Volts connects to
Start with the systems already creating readings, commands, charges and reports. Every connection is scoped first: its direction, frequency, write permission and support status are agreed before work starts.
Bring compatible electricity, water, gas and environmental readings into one building model. Add a reader, gateway or meter only where the required signal is unavailable.
Read from compatible BMS, SCADA, PLC and controller environments, and define exactly which platform owns each writable point before any command is enabled.
Move approved meter readings and allocation outputs into the property or billing process your team already closes - without retyping every tenant line into a spreadsheet.
Exchange authorised costs, invoices and reporting data with ERP, accounting, BI and customer systems through the supported interface agreed for each deployment.
How integration works
Integration succeeds when both sides agree what is readable, what may be written, who owns each point and how failure is handled. The technology comes after that decision.
Inventory devices, systems, protocols, network routes, vendors and access owners; test representative points before quoting the full scope.
Reuse fit-for-purpose equipment, add only the missing data or control layer, and document point ownership and fail-safe behaviour.
Validate values, units, timestamps, commands and exports; approve the data before expanding from the first site.
Volts is designed to work across supported third-party equipment. Where no usable signal exists, the proposal can add Volts or compatible field devices as a separate, itemised part of the site scope.
See Volts HardwareWhy the connection matters
An integration earns its place when it removes a manual step, prevents an avoidable loss or makes a financial result traceable. The platform should connect the reading to the decision that follows.
Existing meters, BMS and SCADA stay where they are. Volts connects to them, retrofits the rest, and starts reading on day one.
The same platform that reads the meter allocates the cost and issues the tenant invoice. No exports, no spreadsheet in between.
Weather-normalised baselines show what changed because of you, not the weather. The numbers hold up in an ISO 50001 audit.
Share the meter list, BMS or SCADA environment and the workflow you need to close. An engineer will show what can connect directly, what needs a bridge and what should stay untouched.